▶️ https://youtu.be/7VdhAC0zFIYVetting navigation observation
The vessel's position was not manually fixed on ECDIS (method of position verification Visual; Radar; Pl; RIO/DOP; Celestial) during whole passage from anchorage to terminal in accordance with navigational procedures. It was noted that in Passage plan the interval planned position was 60 minutes (open sea).
Телеграм канал автора